All services determined by C&L Electric Cooperatives to fall in the category of temporary or low usage service (such as campers and tiny homes) must complete the following prior to construction of facilities: Payment of 100% of the calculated direct cost will be required to construct the extension of facilities. This amount is a non-refundable contribution to Aid of Construction. It is also necessary for a member to provide a meter loop that meets C&L Electric Meter on Pole specifications.

C&L Furnishes

  • Poles
  • Line side connectors

C&L 3 Phases Transformer Concrete Pads September 13, 2023 (PDF)
C&L Underground Service August 17, 2023 (PDF)
C&L Temporary Overhead Service August 16, 2023 (PDF)
C&L Temporary Underground Service August 16, 2023 (PDF)
C&L Meter on Pole June 12, 2019 (PDF)
C&L Overhead Through the Roof Service June 11, 2019 (PDF)
C&L Typical Overhead June 10, 2019 (PDF)

Underground Checklist

Please complete the following online checklist and submit it.

Name(Required)
Address(Required)
Checklist must be completed and returned to C&L. All work and materials must meet the current applicable codes and requirements.
This field is for validation purposes and should be left unchanged.

Underground Checklist August 17, 2023 (PDF)